Capacity Optimizer

Use cases

More chargers than the grid can feed at once.

Public DC fast charging hubs

Challenge

Simultaneous charging sessions exceed the grid connection during peak hours.

Approach

Capacity Optimizer distributes available site power across active sessions in real time, keeping all chargers operational.

Outcome

Higher utilization — more vehicles charged per day without grid upgrades.

Fleet depots and logistics

Challenge

Fleet vehicles need charging during shift changes. Fixed schedules ignore real-time power availability.

Approach

Enforces depot-level limits and prioritizes operationally critical vehicles, adapting to actual site load.

Outcome

Fleet readiness on time — without exceeding site capacity.

Heavy vehicle and truck charging

Challenge

High-power DC chargers for trucks can exceed a site's grid connection in minutes.

Approach

Manages high-power allocations in real time, balancing load across active sessions with strict safety limits.

Outcome

Safely charge multiple trucks concurrently on a constrained grid.

Mixed-use and retail sites

Challenge

Shared electrical infrastructure can't allow EV chargers to compete with HVAC and tenant loads.

Approach

Coordinates EV charging within the remaining power budget, adjusting setpoints as building demand fluctuates.

Outcome

Add EV charging without disrupting existing tenants or building operations.

Sites with BESS and solar PV

Challenge

Battery storage and solar generation create dynamic power availability. Static charger settings waste this potential.

Approach

Integrates with BESS and PV signals to dynamically adjust available charging power — maximizing self-consumption.

Outcome

Better use of on-site energy assets. Lower operational costs.

Staged site expansions

Challenge

Adding chargers over time risks exceeding site limits or requiring costly grid reinforcement.

Approach

New chargers are added incrementally while the controller ensures the site always stays within limits.

Outcome

Scale charging infrastructure with confidence, phase by phase.

Discuss your site

Share your charger plan and grid limits to receive a tailored recommendation.