Capacity Optimizer

FAQ

Frequently asked questions

What is Capacity Optimizer?

Capacity Optimizer is an on-site power controller for DC fast charging sites. It load-balances chargers in real time, enforces grid and site limits, reduces peak demand, and keeps critical control local — even if the internet drops. The product model is CO-LB-100, developed by CapOpt AB in Stockholm, Sweden.

How does EV charging load balancing work?

The controller reads site import from a power meter, polls charger status over Modbus, applies configured limits and priorities, then writes power setpoints to each charger so simultaneous sessions stay within the available connection.

Can it help avoid a grid upgrade?

Often, yes. By dynamically allocating available power across active sessions, with optional peak shaving, many sites can add chargers on the connection they already have instead of waiting for a larger grid feed. Feasibility depends on electrical limits and traffic patterns, so we review site fit before a proposal.

Does it need the cloud? What happens if the internet goes down?

No cloud is needed for power control. Load balancing and limit enforcement run on-site, with full operation during internet outages and fail-safe defaults that protect the site even during a controller restart. Cloud monitoring is an optional add-on for remote visibility, history, and alerts.

Which chargers and power meters are supported?

Capacity Optimizer uses a Modbus-first integration strategy with verified support for leading DC charger brands such as Siemens, ABB E-mobility, Alpitronic, Kempower, EVBox, Sinexcel, and Delta, and power meters from ABB, Bender, IME, Janitza, Garo, and Carlo Gavazzi. Compatibility is reviewed before proposal.

Can it coordinate battery storage and solar PV?

Yes, optionally. Capacity Optimizer can coordinate BESS and solar PV where interfaces exist, and Elecnova ECO-E261LP battery storage is supported.

Who is it for?

CPOs, fleet operators, site owners, installers, and integrators running commercial DC fast charging infrastructure.

How is it priced?

Pricing is quote-based and follows your site: the number and type of DC fast chargers, charger communication interfaces, meter and gateway requirements, BESS or solar PV integrations, commissioning complexity, and cloud monitoring needs. A quote typically includes the controller and license, configuration and charger integration, site limit and priority rule setup, commissioning support, and ongoing software updates.

How do I get a quote or site review?

Send your charger plan and grid limits through the contact form, email info@capacityoptimizer.com, or call +46 10 206 70 03. We typically reply within two business days.

How is it installed?

CO-LB-100 is an industrial DIN-rail gateway powered by 9–30 V DC, rated for −20°C to +60°C. It speaks Modbus to your chargers, reads an external site meter, and keeps the critical control path on-site — no cloud round-trip.

Does it use Modbus or OCPP?

The gateway supports Modbus, M-Bus, and OCPP. OCPP is available when needed; we prefer Modbus for robust, vendor-independent local charger control.

How fast does it respond?

Power systems need fast, deterministic control — not cloud round-trips. The controller responds in sub-second time to load changes and writes Modbus setpoints fast enough to prevent overloads.

What happens if communication or the controller fails?

The control loop follows defined fallback behavior if communication or hardware fails. Fail-safe defaults protect the site even during a controller restart.

Can it prioritize chargers, fleets, or truck lanes?

Yes. Operators configure priority rules between bays, groups, fleets, or truck lanes, along with site, feeder, and group limits that the controller applies in real time.

Does it account for building load?

Yes. The controller reads real-time power from the site main meter, including building loads, then balances active charging sessions so total import stays within the available connection.

What does the optional cloud portal include?

The optional add-on is a secure portal for remote configuration, live monitoring, historical data, and system alerts. Historical trends, alerting, and over-the-air firmware upgrades are available where included in your agreement. The first year of remote access and upgrades is typically included; confirm exact scope in your proposal. Cloud is not required for core power control.

Where are the data sheet and user documentation?

On the Docs page you can download the data sheet with product overview, specifications, and deployment considerations, and user documentation covering installation, commissioning, and operation. Materials are available in English, Swedish, German, and Norwegian.

Didn’t find your answer?

Contact us