Run more fast chargers
on your existing grid
Most sites outgrow their grid connection long before they run out of bays. Adding chargers is easy — staying within the limit while serving real traffic is the hard part.
Vendor-independent — works with any charger, battery, or solar PV brand.
26+ MW installed charging power
15+ sites in operation
5+ charger brands
5+ power meter brands
When the connection isn't enough
When more vehicles charge at once than the grid can feed, breakers trip or charging is throttled. Every new charger then becomes a risk to the whole site — not more capacity.
What it does
More chargers on the connection you already have.
Capacity
Stay within site limits
Dynamically allocate available power across active sessions so the site never overloads.
Peaks
Reduce demand charges
Peak shaving keeps hourly maxima down where your tariff rewards it.
Resilience
Local control first
Core power functions keep running on-site — even if the internet drops.
Where it sits
Between the grid meter and your chargers — with BESS and solar from any vendor.
Product detailsHow it rolls out
From site review to full power — clear steps, no guesswork.
- 01
We review the site
We check hardware, grid limits, and that the solution fits your site — before you commit.
- 02
You install
Gateway on DIN rail and meter connections with your installer — we support as needed.
- 03
You commission at full power
Limits and priorities are activated. Chargers run within the connection you already have.
Hardware we connect
Leading charger and meter vendors — we confirm fit before you commit.


