Capacity Optimizer
On-site power control for commercial EV charging

Run more fast chargers
on your existing grid

Most sites outgrow their grid connection long before they run out of bays. Adding chargers is easy — staying within the limit while serving real traffic is the hard part.

Vendor-independent — works with any charger, battery, or solar PV brand.

26+ MW installed charging power

15+ sites in operation

5+ charger brands

5+ power meter brands

When the connection isn't enough

When more vehicles charge at once than the grid can feed, breakers trip or charging is throttled. Every new charger then becomes a risk to the whole site — not more capacity.

What it does

More chargers on the connection you already have.

Capacity

Stay within site limits

Dynamically allocate available power across active sessions so the site never overloads.

Peaks

Reduce demand charges

Peak shaving keeps hourly maxima down where your tariff rewards it.

Resilience

Local control first

Core power functions keep running on-site — even if the internet drops.

Where it sits

Between the grid meter and your chargers — with BESS and solar from any vendor.

Product details
CloudOptional BESSOptional solarPower meterGridCO-LB-100DC chargerDC chargerDC charger

How it rolls out

From site review to full power — clear steps, no guesswork.

  1. 01

    We review the site

    We check hardware, grid limits, and that the solution fits your site — before you commit.

  2. 02

    You install

    Gateway on DIN rail and meter connections with your installer — we support as needed.

  3. 03

    You commission at full power

    Limits and priorities are activated. Chargers run within the connection you already have.

Hardware we connect

Leading charger and meter vendors — we confirm fit before you commit.

Siemens
ABB
Kempower
Alpitronic
EVBox
Sinexcel

Talk to us

Demo or quote — we usually reply within two business days.